Preconstruction
A successful project needs a successful start. The decisions that set the cost and the schedule are made long before anyone picks up a tool.
Due diligence before you buy: looking at a space? We bring in the people who tell you what’s really there. Site surveys, asbestos testing, MEP inspections, and initial drawings, so you know the condition and the cost before you commit.
Feedback during design: we sit with your architect and engineers while the drawings develop, pricing the design as it moves and flagging the details that quietly drive cost. Where there’s a cheaper way to get the same result, we put the value engineering options in front of you while there’s still time to use them, so the budget stays intact before the project starts.